• 01
  • Sep

We finished the first of two planned work days on the OA trailer. We’re finally installing shelving in the trailer. A much needed addition to say the least. We pulled everything out and installed shelves on the left and right side. We still need to do a bit of tweaking on the left side to make sliding the ‘white building’ poles in and out easier. Next weekend we’ll finish the final touches and get all the junk sorted into new storage bins. Hopefully we’ll be able to toss some of the junk away.

» You can leave a comment, or trackback from your own site.

Leave a Comment

You must be logged in to post a comment.